Project Details

OGS MacArthur Airport

Project Description

  • Name: Repair exterior envelope at Ronkonkoma AASF #1
  • Location: Macarthur Airport, Ronkonkoma, NY
  • Surface Area: 500,000 m2
  • Year Completed: 2017
  • Value: $550.000
  • Coordinated Trades Harri & Gary

Description of the Project

Repairs to the exterior envelope of an army aircraft hangar. Nagan Construction Inc successfully conducted its role as the prime contractor and completed all requirements of this contract with the best value to the government. The project location, Army aviation support facility in MacArthur airport remained operational during the project and Nagan Construction provided maximum safety, security and caution at the entire duration. Qualified key personnel managed the jobsite and coordinated multiple subcontractors with a close proximity to the sensitive army areas and equipment.

Coordinated Trades

  • Selective Demolition and Removal
  • Hazmat Removal
  • Unit Masonry
  • Metal Fabrications
  • Carpentry
  • Fluid-Applied Roofing and Flashing
  • SBS Modified Bitumen Roofing System
  • Painting

Pictures